
Originally Posted by
SRADkneedragger
There is still about 6 weeks of work left(and 4 weeks till the Texas Mile) But the plans include:
Big AirBox Mod
Sealing ram air tubes
Lowering the bike
New shaved tires
Remove the rear fender/mirrors/passenger pegs/Turnsignals/reflectors
Change the velocity stacks
move to Synthetic oil
New Chain and Sprockets
Swingarm extensions
IF there's time we will try to get the cut down tank finished
BLue painters tape on every seam
and we are looking at POSSIBLY ceramic wheel bearings
Of course we are always open to ideas and suggestions also
Marie
Heavy Bus Racing
Cool. Ceramic bearings are something I have not gotten around to. And I really want them. I would find a already cut tank or get a damaged tank. Dont mess with your stocker, it look perfect. Besides, you will save on down time.
Chad Eighner
To view links or images in signatures your post count must be 1 or greater. You currently have 0 posts.
If I argue with you, it's only because you are wrong.
Bookmarks